Located at the Preston Centre, the project consisted of the design of mechanical and electrical modifications associated with the conversion of the 265,000 sq. ft., 24-story office tower into a multi-use facility that includes residential and commercial space, including fitness centers, a coffee shop, a grand lobby, a sunken garden, a gazebo, restaurants, office space and 105 apartment units.
Residential levels include air-cooled heat pumps, dedicated outdoor air systems, high rise dryer exhaust systems, central high rise bathroom exhaust, and electric meter banks provided for tenant utility billing. A sunken garden below street level included water fountains & outdoor seating.
The design and construction were phased with separate bid packages for MEP infrastructure upgrades, elevator upgrades, commercial space renovations and the apartment build-out.
The project scope included a replacement fire alarm system for the entire facility.
• Duplex system sump pump and emergency sump pump in the sunken garden area
• Residential – Dedicated outside air system unit for residential and corridors
• Residential – Clothes dryer exhaust – Enervex fans for clothes dryer exhaust collecting multiple clothes dryers up through the building
MEPT Designer