Construction of a new conference/data center to serve multiple functions. A new data center was needed because the existing data center was being displaced by the development of new roads west of Parsons site. Conference center space had long been in short supply on the Nationwide Children’s campus and this building fulfilled those requirements. The building consisted of four floors plus a basement.
MEPT Engineer